twitter linkedin
 
You are: home > chelmer village - stepoc shuttering block system

Retaining Wall System Case Studies

Stepoc Wall at Chelmer Village

Chelmer Village – Chelmsford Flood Alleviation Scheme

Stepoc Shuttering Block System

The new Stepoc wall, located between the village’s recreation field and the houses, will directly protect approx 120 properties and is part of a larger Flood Alleviation Scheme to protect Chelmsford.

The scheme, which is a partnership between the Environment Agency and Chelmsford City Council, involves the "Construction of a 775m long flood defence wall of average height 1.2m incorporating seepage cut-off trench up to 7m deep from ground level. The flood wall is to be located to the north-west of the Chelmer Village suburb within Chancellor Park, west of the A12 and the River Chelmer. The wall is to contain two flood gates and two ramped access points. In addition to this a 3m and 2m high mesh fence are proposed to be constructed at separate locations along the wall with associated landscaping".
Quote from PCI (pre construction information).

  

Case Studies

Travelodge Euston

Glasshoughton Railway Station

Tesco Bradford

East London Line Project

Ryton Park Primary School

Waterloo Mount

Chelmer Village

Littleborough Station

University of St Mark & St John

Sondes Place

Wodehouse Hotel

Back to 'Case Study List' 

 

Contact us

Anderton Concrete Products Limited
Units 1 & 2
Cosgrove Business Park
Soot Hill
Anderton
Northwich
Cheshire 
CW9 6AA

Rail, Fencing & Building 
T: 01606 79436
E: sales@andertonconcrete.co.uk

Civil Products & Sales 
T: 01606 535300
E: civils@andertonconcrete.co.uk